Power
The power supply of the data center includes utility power supply and emergency power supply
Utility power: double-circuit heteroclinic power supply
Emergency diesel power generator set
  Single unit power capacity exceeding 2,000KVA with the general system meeting    Tier4 standard
  N+1 backups of diesel generator set
  Equipped with oil tanks of sufficient capacity including underground oil tank outdoors    daily oil tank at power generator room and all oil pump facilities including oil pump and    oil pipe etc
UPS
(3+1) backup in the 1st phase to be expanded to 2(3+1)in the latter phase
UPS main frame and batteries are physically separated
MGE Galaxy 6000 series supply clean and stable power
Duel-conversion operating pattern supplies clean output waveform
12 pulse + active power filter with THDI controlled within 3%
Power supply and distribution system
 Full redundancy power supply system can completely meet Tier4 standard
  Complete set of Suhneider framework low-voltage switch system
  GE 4000A PC-level with bypass ATS
The above power supply system is located on the two sides of the power area on the 1st floor with solid wall standing in the middle for separation. In this way, even if one side of the floor explodes or is destroyed, the power supply system on the other side is still capable of providing the hosting room with power not lower than Tier3 standard. In one word, SDS’s IDX hosting room has, in a real sense, realized redundancy backup for every part of power supply system.

Measures for Emergency Power Cutoff

 The other transformer station starts to work if one transformer station goes wrong
  After the two-circuit utility power is cut off and before the emergency power generator starts to work, UPS is capable of full-load operation for 30minutes(normally, UPS does not conduct full-load operation; so, in case of emergency, UPS is capable of supporting about 1hour power supply)
 The alternate diesel power generator set is automatically started for power supply (with    parallel operating system and load management system)
   It takes less than 15seconds from the generator set receives the order to support the rated load; and the total capacity of oil tanks is capable of supporting the full-load operation of power generator for not less than 48hours 
 When the oil tank reserve of diesel generator goes lower than the alarm line, it will be    shuttled to the nearest oil station for more oil; when at the pre-set alarm line, shuttle    will be used to add more oil
   Notes: we enjoy the high authority of oil station; roundtrip is about 15minutes.